Hamad International Airport Station Box

Hamad Airport doha mezzanine level

Precision. Accuracy. Patience

Hamad Airport DohaThe Hamad International Station Box is a sub-surface structure composed of (approximately) a 305m long by 25m wide by 20m deep box with two abutting single level MEP zones approximately 10m deep. The Station Box is directly adjacent to the airport lagoons which are connected to the Arabian Gulf. The groundwater table has been encountered at about +0.5m QNHD, or about 2.5m below the current ground level.  Excavation of the box was done using a top-down method.

Part of the requirements in the construction of the station box is monitoring the movement or behaviour of the structural elements such as the diaphragm wall, concrete beams, plunged columns and temporary steel props; and the movement of the ground and nearby structures surrounding the box.

Automated In-place bi-axial inclinometers were used to monitor wall deflection, both the x and y directions. These instrument record sub-millimeter movement of the diaphragm wall on an hourly interval, and the data were instantaneously processed and the results were accessible at almost real time.  The In-place Inclinometers were also supplemented by manual inclinometer which were surveyed 3x a week.  Ground settlement were monitored using precise levelling, and wall movement of the nearby bridges were monitored using 1” (one-second) Total Station.

Hamad Airport Doha groundwater modellingVibrating wire strain gauges were used to monitor the load of the concrete beams, plunged columns and the temporary props. These instruments were hard-wired to dataloggers, which sends all the data remotely to a central monitoring PC. An audio-visual alarm was also connected to the datalogger, which tripped whenever the set limit is breached. The amber trigger limits were breached several times, but no red trigger limit was ever encountered.

During the excavation stage, the Monitoring Group consisting of Group Five’s Project Manager and WJ’s expert reporter convened daily to discuss the results of the monitoring.

Precision.  Accuracy.  Patience. Confidence!

MAIN CONTRACTOR:  Group Five Construction
ENGINEER: Mott MacDonald
PROJECT MANAGER: MACE
CLIENT:  NDIA Steering Committee,

Project Scope

  • Airports
Share

Related Projects

Lusail Expressway

Lusail Expressway

  • Deepwell dewatering and
  • sump-pumping a major expressway
  • -Read More-
  • Dubai Water Canal Extensions

    Dubai Water Canal Extensions

  • Canal extensions
  • and deepwell dewatering
  • - Read more -
  • La Mer (Jumeirah Open Beach)

    La Mer (Jumeirah Open Beach)

  • A robust dewaterng
  • supporting a basement carpark
  • -Read More-
  • Interested? Find out more

    If you'd like to find out more about WJ Philippines, our services or recent projects, please get in touch


      Name (required)

      Your Email (required)

      Your Message

      t +63 956 677 9185 | info@wjphilippines.com
      © 2021 WJ Groundwater Limited | Privacy Policy | Terms & Conditions
      Developed by Riotspace Creative Limited